HSSE Inspection

HSSE Inspection

A. Conduct HSSE Inspection by Inspector (HSSE)

Login to CTMS

Click on the Conduct HSSE Inspection menu


Click the + (plus) button on the Inspection list


Fill in the required information, OrganizationFunctionDesignation, Remark if needed, Start Inspection and if everything is filled in then click the SAVE button.



Click the Orange menu button in the lower right corner, then click the + (plus) Add Findings button


Fill in the Finding editor with the required information such as Location, Company Responsible for finding, company trade, Responsible PIC, Type of HSSE Finding, Act or Condition, and so on.

Then click the SUBMIT button at the bottom.


The PIC will receive a telegram notification and an outstanding task update for the Rectification finding that you have sent.


B. Rectification by Person-In-Charge (Work)

Login to CTMS

Click the My Tasks menu


Click HSSE Inspection card 


Click the Pencil button on finding inspection in your Outstanding tasks.


Check Finding from the HSSE Inspector, then perform Corrective action by pressing the blue + (plus) button.



Fill in the RemarkDate and Time and attach the required materials then click SUBMIT.


The notification will be sent to the Inspector (HSSE) and the status is Pending Verification.


C. Verification by Inspection (HSSE)

Login to CTMS

Click the My Tasks menu


Click HSSE Inspection card  



Click the Pencil button on finding inspection in your Outstanding tasks. 


Click Corrective action that has been completed by PIC


Check the Corrective Action from the PIC, if the corrective action is appropriate, give a remark to approve and click the APPROVE button




D. Rejection Corrective Action by Inspector (HSSE)

If the corrective action still doesn't meet the requirements, you can Reject the corrective action in the following way.

Open Corrective Action by PIC

Click on 3 dots menu and click Reject



Fill in Reject Reason, set Due Date and Time for corrective action, then click the REJECT button.






















    • Related Articles

    • Project Role for HSSE Inspection Module

      Inspector (HSSE) User: Maincon user Permission: Conduct Inspection (HSSE INSPECTION) Allowed to manage conduct HSSE Inspection Raise Finding (HSSE INSPECTION) Allowed to read inspection Allowed to raise finding Allowed to make the approval on ...
    • Submit Checklist for Formwork Inspection

      Login to CTMS Click Conduct Site Inspections at SITE INSPECTION menu Click + button beside calendar of Site Inspection In the Select Template list, select Checklist for Formwork Inspection  Fill in the required information, Location, Remark ...
    • Submit Reinforcement Inspection Checklist

      Login to CTMS Click Conduct Site Inspections at SITE INSPECTION menu Click + button beside calendar of Site Inspection In the Select Template list, select Steel Reinforcement Inspection Checklist Fill in the required information, Location, Remark ...
    • Submit Inspection Request by PE (Project Engineer)

      Login to CTMS In the RERTO Inspection module, click Conduct RE/RTO Inspection        Click [ + ] button on inspection detail list              Fill in the Location, Location Remark, Inspection Scope, Inspection Sub Scope, and Description of Work to ...
    • Download RERTO Inspection report

      A. Download RERTO Inspection pdf file 1. Login to CTMS  2. Click on Records - RE/RTO Inspection 3. Click the 3 dots button on the inspection you want to download 4. Click on Print button 6. Click print orange button in the corner B. Bulk download ...